Buchanan Ranch · build plans · shared copy
Ranch Build Plans
Build plans and punch lists from the fall 2026 work. These dated plans are reference material; confirm current scope and completion before using them for new work.
Weekend Punch List October 3–4, 2026 punch list — retained for reference and follow-up. Needs the list key; item status is not a current site-health check.
Camera Wiring Plan For the electrician — run schedule C01–C13, cable spec, where each run terminates, mounting and the culvert outlet.
ADU Closet Prep For the handyman — take the left-wall shelves and the top three back-bay shelves out, then build a stud-anchored backer on the back wall for the cable box. Photos included.
ADU Rack October 1, 2026 closet-prep plan (handyman + electrician). Rack layout U by U, closet plan, wall-panel port map (camera runs on ports 3–5 and 16), power, build order.
The Protect Cutover The owner's camera plan — what's arriving, where each camera goes, the doorbells, network security, build order.
Unlisted copy for the people doing the work. Questions on the day: Bill.